Honest Maids

Post Construction Cleaning in Chatsworth

Post Construction Cleaning in Chatsworth, CA

4.8 from 48 Google reviews

When the crew finishes and the tools are gone, Honest Maids clears the building dust and debris a remodel or new build leaves behind. We are family owned and based in Reseda, our cleaners are our own trained team, the estimate is free, and no card is needed to book.

Free estimate before booking · No card needed

A Chatsworth room after a post construction cleaningA Chatsworth room before a post construction cleaning
Serving Chatsworth & the ValleyFree estimatesNo card to bookYour own trained teamSatisfaction guarantee

Honest Maids handles post construction cleaning in Chatsworth. When a remodel wraps or a new build is handed over anywhere from the equestrian pockets near Stoney Point to the tract streets off Devonshire Street and Nordhoff Street, we are the family owned crew that comes in after the contractor and clears the fine building dust the work left behind. We are based in Reseda and serve the whole San Fernando Valley, the cleaners who show up are our own trained people rather than subcontractors, we bring every supply, the estimate is free, and no card is needed to reserve a date.

This is a specific job, and it is not the same as a regular deep clean. A finished remodel is coated in drywall and sanding dust that has drifted into every drawer, settled on top of new cabinets, worked into vent grilles and window tracks, and dulled the light fixtures and blinds. Out here in the far northwest Valley, hard against the Santa Susana Mountains where the air already carries grit off the open land near Mason Avenue and Plummer Street, that dust is stubborn and it keeps resettling. Clearing it properly takes more than one pass, and the point is a space that is genuinely move in ready rather than one that only looks wiped down at a glance.

How it works

From the last day of work to a move in ready home

Tell us what was built

Text or call with the cross streets, whether it was one room or a whole home, a remodel or a new build, and roughly when the crew finishes. The estimate is free and comes back the same day.

We time it right

Post construction cleaning works best once the contractor is truly done and the last dust has settled. We coordinate the date around that so we are not cleaning while sanding or trim work is still going on.

We clear it in passes

Our own team arrives with all supplies, takes down the heavy dust and debris first, then details the hidden spots and comes back over the surfaces until the fine dust stops resettling.

You move in

You walk into a finished space that is ready to live in, not one that still needs a wipe before the furniture arrives. If a surface was missed, one text and we return.

Real reviews

In our customers' own words

4.8 from 48 verified Google reviews

We recently hired Honest Maids to clean our two-bedroom apartment, which was covered in construction dust from a new build.
Taye
They treat your home like it is their own.
Darcy
Tania always leaves my house spotless, and I truly love her work.
Ariana

Chatsworth questions

Post construction cleaning in Chatsworth, answered

Why does construction dust need more than one pass?
Drywall and sanding dust is extremely fine and light, so the moment air moves through a room, whether from a door opening, a fan, or the heating and cooling kicking on, it lifts off one surface and settles onto another. A single wipe looks clean until an hour later when a new film has appeared. We take the heavy layer down first, then come back over everything a second time, and on a bigger job a third, so the dust has actually been removed rather than just moved around the room.
How is this different from a normal deep clean?
A deep clean tackles built up grime in a home that is already lived in, things like oven grease, soap scum, and grout that has darkened over months. Post construction cleaning is a different problem. There is very little grime and a great deal of fine building dust and debris, spread evenly across brand new surfaces that also need protecting from anything abrasive. The tools, the order of work, and the number of passes are all built around dust and new finishes rather than around old dirt.
When after the contractor finishes should you come?
The best time is once the work is genuinely complete and the crew and their equipment are out, because any sanding, cutting, or trim work that happens after we leave simply creates fresh dust. If your project is wrapping in stages, tell us the plan and we will time the clean for the point where nothing else will stir up debris. We would rather wait a day and do it once than come early and have it undone.
Will you protect our new floors and finishes?
Yes, that is central to the job. New wood, tile, and carpet each get handled in the way that suits them, and fresh counters, cabinets, and fixtures are cleaned without the harsh scrubbing that could scratch or dull them. The goal is to take the dust off a new surface while leaving the surface exactly as the contractor delivered it.
Can you get the fine dust out of vents and cabinets?
Yes, and those hidden spots are where post construction dust hides longest. We work through the inside of new cabinets and drawers, the vent and register grilles, the window and sliding door tracks, and the tops of doors and trim. Skipping them is the usual reason a room that looked clean starts collecting dust again a few days later, so they are a standard part of the pass rather than an extra.
Do you remove stickers, paint specks, and adhesive residue?
Yes. New windows, glass, and appliances usually arrive with manufacturer stickers and labels, and a finished remodel tends to leave paint specks, overspray, and adhesive or caulk residue along edges and seams. We peel the labels, lift the specks, and clear the residue as part of getting the space truly finished, not just dusted.
Is post construction cleaning one visit or several?
For a single room or a small project it is often one thorough visit with multiple passes inside that visit. A whole home remodel or a new build, especially a larger one, sometimes needs more than one appointment, because dust that settles overnight after the first clean is worth a final pass before you move in. We will tell you honestly which your project calls for when we give the estimate.
Can you coordinate with our contractor or builder?
Yes. Plenty of the post construction work we do is arranged directly with a contractor or builder rather than the homeowner, and we are used to fitting the clean into the end of a project schedule. Give us a realistic completion date and access details and we plan around the crew so we arrive at the right moment.
Do you handle a whole home remodel differently from a single room?
Yes. A single finished room is contained, and the dust mostly stays within it, so it usually takes one focused visit. A whole home remodel spreads dust through hallways, shared air, and rooms that were never touched, so it takes more time, more passes, and sometimes a second appointment. We scope the number of passes and visits to the size of what was built.
Do you clean after new builds as well as remodels?
Yes to both. Chatsworth has an unusual mix out here, with older tract homes being remodeled, newer developments, and ground up new construction on the pockets of open land near the mountains. A new build carries just as much fine dust as a remodel, sometimes more, and it gets the same multiple pass treatment to reach a move in ready state.
We are near the open land and it is always dusty here. Does that matter?
It does, and it is worth planning for. The far northwest Valley against the Santa Susana Mountains, near Stoney Point and the semi rural and equestrian pockets, carries a lot of ambient dust off dry open ground. That outdoor grit blends with the construction dust and drifts back in through any open door or window, which is one more reason a proper post construction clean is done in passes rather than a single wipe down.
What are your hours, and how do we book a post construction clean?
We are available Monday to Saturday, 8am to 6pm. Call or text (818) 414-8012, or email honestmaidsla@gmail.com. Tell us the size of the space, whether it was a remodel or a new build, and when the work finishes, we give you a free estimate, and we set a date. No card is needed to book.
What if we spot dust you missed after you leave?
Tell us and we come back. Fine construction dust is exactly the sort of thing that can surface after the fact, and every visit carries a satisfaction guarantee. If a shelf, a vent, or a track was missed, a text to (818) 414-8012 is the fastest way to reach us and we make it right.
How much does post construction cleaning in Chatsworth cost?

The honest answer is that the price depends on the size of the home, the number of bathrooms, whether this is a first visit or a regular one, and how the home has been used up to now. That is why every job starts with a free written estimate rather than a flat rate lifted off a website. Text or call (818) 414-8012 with the number of bedrooms and bathrooms and roughly what you need, and we send a real figure back, usually the same day. Every price is agreed before we start, nothing lands on you at the end, and no card is needed to hold the slot.

Are your cleaners insured, bonded, and background checked?

Yes. Honest Maids is a licensed and insured family owned company based in Reseda, and every cleaner on our team is our own employee, screened and trained by us before their first visit. Nothing is subcontracted, so the person who arrives at your door in Chatsworth is on our payroll, in our uniform, and covered by our insurance. We are happy to share our license and insurance details before your first clean if you want to see them, and many building managers ask for a certificate of insurance on file.

What products do you use, and are they safe for pets and children?

We bring every supply and machine with us for every visit, so nothing has to be set out. Our standard kit uses products that are safe around pets and children, and where a surface calls for a stronger product (such as a heavily soiled oven or serious mineral buildup) we tell you first and use the mildest option that will do the job. If you prefer a specific brand, a fragrance free product, or a completely green line, tell us in the booking and we will use what you have. The choice is yours.

How far in advance should I book, and can you come the same day?

For a regular clean in Chatsworth we can usually reach you the same week, and a small job can sometimes fit into the same day. Move outs and post construction jobs need a little more lead time because they run longer, so book those a few days out when you can. The fastest way to check availability is a text. We are staffed Monday to Saturday, eight in the morning to six in the evening, and a message outside those hours is answered the next working morning.

What forms of payment do you accept, and when do I pay?

You pay after the clean is complete, once you have walked the home and everything is right. We take card, bank transfer, Zelle, cash, or check, whichever is easiest. Recurring customers are usually set up on a saved card that runs automatically after each visit, but that is optional and there is no card on file for a first visit. If you ever have a question about a charge, one text and we sort it out that day.

What is your satisfaction guarantee, and how does it work?

Every visit carries a plain guarantee: if something is not right, tell us within seven days and we come back to fix it, at no charge. We do not ask you to argue for it or fill out a form. We would rather return and put it right than leave a customer in Chatsworth feeling like they paid for something they did not get. That is one of the reasons regular customers stay with us, and it is the standard the reviews are talking about.

Do I need to be home during the clean?

Only if you want to be. Many customers in Chatsworth give us access through a code, a key with a neighbor, a lockbox, or a building doorman, and come home to a finished house. Others prefer to stay. Either way is fine, and we walk the space with you or send a note with a few photos before we leave, so nothing is a surprise. If the building has parking rules or a call box, tell us in the booking and we handle it from there.

How many passes does a post construction clean take, and why?

Post construction cleaning is scoped as a rough pass and a final detail pass at minimum, because construction dust is much finer than household dust and stays suspended for days after work stops. A single wipe redeposits about half of what it lifts. The rough pass removes bulk debris and heavy dust. The final pass, run after the dust settles, wipes every surface again, including behind fixtures, inside cabinets, windows, tracks, grout, and vents. Heavy jobs sometimes need a third pass, and we scope that on the written estimate.

Do you haul away construction debris?

We remove bagged trash, packaging, protective coverings, and light construction leftovers as part of the clean. Large debris (broken drywall sections, pallets, tile offcuts, appliances) is not part of a standard scope, but we can arrange a debris haul at cost if you tell us in the booking. That way one team handles the site, and the property is truly ready to hand over.

When is it safe for a family to move back into a home after a remodel?

Once the final detail pass is complete and the air has cleared. That usually means the day after the last pass for a room level remodel, and a day or two after for a whole home remodel with heavy dust. If anyone in the household has respiratory sensitivities, we recommend running the HVAC on a fresh filter for a day before move in, and we can add a vent and filter clean to the scope so the system is not blowing residual dust.

As many passes as the job needs

Why does post construction cleaning need more than one pass?

Post construction cleaning takes more than one pass because construction dust is far finer than household dust and stays suspended in the air for days after trade work ends. A single wipe redeposits about half of what it lifts, so the site needs a sequence: rough clean, allow the air to settle, then a final detail pass.

Pass one, the rough clean, removes:

  • Bulk debris, construction materials, packaging, and stickers
  • Heavy dust from every horizontal surface, floors first, then work down from ceilings
  • Protective coverings from fixtures, windows, and appliances

Pass two, the final detail pass, done after the dust has settled overnight:

  • Every surface wiped again, including behind and under fixtures
  • Windows and glass polished, tracks and frames cleaned
  • Inside every cabinet, drawer, and closet
  • Grout, tile edges, baseboards, and vent covers
  • Final vacuum and mop, moving from the far corner out

Heavy jobs (whole home remodel, tile cutting on site, drywall texture spray) sometimes need a third pass; we scope that on the estimate before any work is booked.

Why construction dust takes more than one pass Four stages of the same room. Stage one, straight after the work: debris on the floor and a heavy layer of dust on every surface. Stage two, the first pass: the debris is gone and the surfaces are wiped, so the room looks finished, but the fine dust is still hanging in the air where it cannot be wiped. Stage three, some hours later: that airborne dust has settled back down onto the surfaces that were just cleaned, so the room is dirty again without anyone touching it. Stage four, the later passes: the settled layer comes off, the places dust hides are worked, meaning vents, tracks, the tops of doors and inside cabinets, and a final detail pass takes off adhesive residue, paint specks and sticker glue. The point is that a single pass cannot work, because the dust that ruins it has not landed yet when the first pass happens. Why construction dust takes more than one pass The dust that ruins it has not landed yet when you first clean. Honest Maids AFTER THE WORK Debris, and dust on every surface. PASS 1, LOOKS DONE Surfaces wiped. The fine dust is still in the air. HOURS IT LANDS AGAIN The same surfaces are dirty. Nobody touched them. PASS 2 AND 3 Taken off again, then detailed. WHERE THE LATER PASSES GO Vents and returns, window tracks, the tops of doors, inside cabinets and drawers, light fixtures, then adhesive residue, paint specks and sticker glue off new fixtures and glass. WHY ONE PASS CANNOT WORK Not because the first pass was done badly. Because the dust that ruins it had not landed yet.
Construction dust is finer than household dust and stays airborne for hours, so it settles back onto everything already wiped. The number of passes a job needs is set by the work that was done, not by the size of the room.

Just finished building in Chatsworth?

Text us for a free estimate on clearing the construction dust, or call and a real person will answer.

(818) 414-8012Text us for estimate

Accessibility

Dark mode
Larger text
Higher contrast
Reduce motion